Common Parts Refurb Complete

A full common Parts Refurbishment has been fully completed.

A full electrical overhaul undertaken installing PIR detection system. Installation of 2 large feature pendant light fittings in the entrance lobby really giving an impressive impact as you enter the building. A further 9 Smaller pendants have been installed on each half landing within the new raft ceilings along with dimmable LED strips around each perimeter. All new face plates and plug sockets have also been upgraded.

Large Calacatta Porcelain tiles have been installed in the entrance lobby, All remaining floor coverings have been carpeted. New Dado rails have been installed throughout with New Oak clawed melamine Cladding panels installed beneath the dado rails in the entrance hall. Feature wallpaper has been installed on the staircase beneath the dado rail along with full decorations to the remaining areas.A full common Parts Refurbishment has been fully completed. A full electrical overhaul undertaken installing PIR detection system. Installation of 2 large feature pendant light fittings in the entrance lobby really giving an impressive impact as you enter the building. A further 9 Smaller pendants have been installed on each half landing within the new raft ceilings along with dimmable LED strips around each perimeter.


Featured Posts
Recent Posts